Building the new Home

A webpage dedicated to building our new home, new construction, by Forino builders in Douglassville, PA. From framing to drywall to moving in. We'll hopefully capture every step by step process to building a new home.

Name:
Location: Limerick, Pennsylvania, United States

Tuesday, January 10, 2006

Master Bath grouted and Kitchen Island Started

The master bathroom has been grouted. It came out pretty nice. The floor we chose ties in the colors of the room nicely. I still can't wait to rip it up though to put tile down!

They also began installing the island. It's amazing how much smaller the kitchen looks when they do that!


There's something bothering me about the island though. If you look at the side facing the fridge, you will see that there is one cabinet front and then the side of the other cabinet. This looks strange, but I supposed we could buy a "fake front" to fix it. The big concern is look at the bottom of the cabinets. The side part goes straight to the floor. The other cabinet has a kickplate at the bottom. To me, this looks bad.... looks pieced together.



0 Comments:

Post a Comment

<< Home