The mirrors, toilet paper holders and towel holders were installed in all the bathrooms yesterday. 


They also began installing the kitchen cabinets and countertops..... big problem.
The cabinet they put in for the double ovens.... is a SINGLE oven cabinet. I contacted my realtor and let him know that it needs to be changed before closing because we have the double ovens being delivered and installed the day after closing. I imagine it will take some time to order the new cabinet... hopefully they get on this quick.
They installed the countertops too... boy do they look terrible. I can't wait to replace it with granite :) I took pics of the cabinets, but I didn't get to upload them. Maybe tonight.
They also put in drainage for the front of the house.... thank God because the water kept building up in the corner under the bay window.... sooner or later it would have caused problems with water in the basement.



They also began installing the kitchen cabinets and countertops..... big problem.
The cabinet they put in for the double ovens.... is a SINGLE oven cabinet. I contacted my realtor and let him know that it needs to be changed before closing because we have the double ovens being delivered and installed the day after closing. I imagine it will take some time to order the new cabinet... hopefully they get on this quick.
They installed the countertops too... boy do they look terrible. I can't wait to replace it with granite :) I took pics of the cabinets, but I didn't get to upload them. Maybe tonight.
They also put in drainage for the front of the house.... thank God because the water kept building up in the corner under the bay window.... sooner or later it would have caused problems with water in the basement.

0 Comments:
Post a Comment
<< Home