2nd Floor Doors
The rest of the doors have been installed. Other than that, not much progress around the holidays.... I was dissapointed that they didn't take advantage of the warm weather to start the exterior stone work.
The store we bought the appliances from called today, wanted to make sure we knew the dishwasher we bought needed a receptacle. I read the user manual though, and the back panel of the dishwasher can be opened and the cord can be removed so the dishwasher can be hardwired like normal... so no big deal. We also made arrangements to have the dw, fridge, and double ovens delivered friday the 27th.
The store we bought the appliances from called today, wanted to make sure we knew the dishwasher we bought needed a receptacle. I read the user manual though, and the back panel of the dishwasher can be opened and the cord can be removed so the dishwasher can be hardwired like normal... so no big deal. We also made arrangements to have the dw, fridge, and double ovens delivered friday the 27th.

0 Comments:
Post a Comment
<< Home