Steps Poured and Driveway Gravel Laid

Sorry for poor picture quality, we didn't get to the house until almost dark... and although my camera can take pictures in the dark without the flash, I can't seem to hold it steady for the 2 seconds it takes to capture enough light for a picture.
Yesterday the concrete was poured for the front porch, steps and walkway. They did a pretty nice job on it compared to some of the other homes I've seen. It was still wet when we got there, so we couldn't go in the house (all the other doors were locked). Hopefully, all the rain we got last night didn't affect the newly poured concrete.

Also, they put down a layer of gravel for the driveway. For some reason they didn't spread it all the way to the garage though and stopped 4 feet short? There's some concrete build up about 4" away from the garage where they spilt while pouring the garage floor... one good thing about them not paving the driveway is I should have time to sledge hammer it out of there before they pave.... otherwise we'll only have a 1" layer of pavement in those spots instead of the 3" it should be and I'm afraid that will lead to cracks over time.


0 Comments:
Post a Comment
<< Home