Building the new Home

A webpage dedicated to building our new home, new construction, by Forino builders in Douglassville, PA. From framing to drywall to moving in. We'll hopefully capture every step by step process to building a new home.

Name:
Location: Limerick, Pennsylvania, United States

Wednesday, November 28, 2007

Insulation In

Ok it's been too long since I last posted. The little things here and there took way too long. The electrical took much longer than I would have ever thought!

I had to figure out what to do on the stairs leading down to the basement. I ended up studding them with 1x3s and foam in between.



We got the insulation up, that was NOT a fun job




This is the outside of the theater wall, it shows the weave of the insulation and the eyeball lights that will be shining on pictures against the wall




A lot of wires in the equipment closet!




And finally some pics of the theater

Looking at the front of the room






We got four estimates on drywall, one was astronimical, two were in the 6k range and one was in the 4k range (and was the company that drywalled the rest of our house when it was built)... we went with the 4k route :)

Nick

0 Comments:

Post a Comment

<< Home