Building the new Home

A webpage dedicated to building our new home, new construction, by Forino builders in Douglassville, PA. From framing to drywall to moving in. We'll hopefully capture every step by step process to building a new home.

Name:
Location: Limerick, Pennsylvania, United States

Thursday, March 22, 2007

More Framing Done

Framing is almost complete in the basement. I just have to do the soffits around the theater.
Here is the view from coming downstairs and turning the corner:

On the right is the wine closet, on the left is the hot water heater closet. Not sure what to do with the middle area yet.... it's 5' deep, with the section to the left of the pole 5' wide and the section to the right 4' wide. I was thinking maybe an arcade with a pinball machine and arcade machine in each "slot".
Here is the view down the length of the basement (please excuse the mess):

To the left is the furnace room. The rest of it is open area, with 8' width under the soffit and 8' width outside it. The ceiling height under the soffit is 6'7" and 7'9" outside it.
Here's the view as you turn the corner at the far end to head towards the theater:

On the right where the electrical panel is, is where the wetbar will go. We were thinking narrow cabinets with a countertop and a few stools, then maybe a movie poster to act as the door to the electrical panel.
On the left you can see the door to the bathroom. Across from that is the theater:

Here is the view from the screen wall looking back:

You can see the equipment room off to the left at the back.
Nick

0 Comments:

Post a Comment

<< Home