Holy Pipes Batman!
The workers were busy today, very busy!

I didn't get to the house until dark tonight, first thing I noticed was that the shingle stacks were on the roof to soon be put on and the roof was placed on top of the second bow window.
Upon entering the house I smelled a real strong smell, one that I know well from my aquariums.... PVC Glue! Sure enough, the first and second floors were completely plumbed! Water supplies, vents, drains, everything. The basement hasn't been plumbed yet, but the piping is laying down there and will probably be done tomorrow.
One large concern I have is that the drain line comes down into the basement and goes into the ground.... not where the drain pipe was run under the house though. It was too dark to see what exactly was going on, but I've definitely got to make sure that it's not just put down 1' into the dirt.

The plumber added the faucet to the spare bathroom.
They also framed out the shower today and installed all of the plumbing for it.

Along the left side of the house, the trench is dug for the electric.

Along the right side of the house, the trench is dug for the gas line.

The gas meter has also been added to the side of the house.

0 Comments:
Post a Comment
<< Home